Interactive estimate
Build your estimate from your own quotes
Enter the figures from a written quote (or two). Leave a line blank if it is not part of your project. The calculator shows each line's math so you can check it against the proposal.
Your estimate
Enter at least one figure to see a total. JavaScript is needed for live math; the formula below works by hand.
| Item | Math | Amount |
|---|---|---|
| No figures entered | — | — |
| Base estimate | Sum of lines | — |
| High scenario | Max depth + contingency | — |
This is arithmetic on the numbers you entered, not a quote, an average or a prediction. Depth, geology, access and local rules can change the real cost.
The formula
Base estimate = (expected depth × drilling rate) + (casing length × casing rate) + every quoted lump sum.
High scenario = [base estimate + ((maximum depth − expected depth) × drilling rate)] × (1 + contingency ÷ 100). If you leave maximum depth blank, the high scenario only adds contingency.
This well drilling cost calculator works with the numbers from one or more written quotes. It multiplies per-foot items, adds lump sums, and shows a base estimate next to a high scenario built from the maximum depth you would approve. It does not supply prices: a calculator that invents a local rate would only give you false precision.
How do you use the well drilling cost calculator?
- Start with the quote. Copy the drilling rate and the expected depth the contractor wrote down. Most contractors charge for drilling by the foot, which is why depth drives the cost of drilling and piping. Water Systems Council: Determining the Depth of a Well
- Add casing separately. Contract guidelines from the National Ground Water Association (NGWA) recommend itemizing drilling per foot and casing per foot, with the casing diameter and thickness stated. NGWA: Guidelines for Written Contracts
- Enter each lump sum the quote lists. Leave blank anything the quote does not include, then ask the contractor whether that item is excluded or simply missing.
- Set the high scenario. Enter the maximum depth you would approve and a contingency percentage you can justify.
Which line items belong in a complete estimate?
A written, itemized estimate is the recommended starting point. A Montana well-owner guide lists the kinds of items an estimate can break out: equipment mobilization, drilling per foot, casing per foot, sealing materials and labor, screen or drive shoe, development, pump testing, grouting, the pump and accessories, disinfection and testing. Montana DNRC well-owner guide (revised 2007) [MT-DNRC source note]
| Line | How it is usually priced | What to confirm in writing |
|---|---|---|
| Drilling | Per foot | Expected depth, depth bands, and what happens past the estimate |
| Casing | Per foot | Diameter, material, wall thickness, length |
| Grouting and sealing | Lump sum or per foot | Material and method used to seal around the casing |
| Development and yield test | Lump sum or hourly | Test length and what the written report will show |
| Pump system | Lump sum | Pump, drop pipe, wire, controls and installation |
| Pressure tank | Lump sum | Tank size and fittings |
| Water line and electrical | Lump sum or per foot | Trench length, who does the electrical work |
| Permits and fees | Fixed fees | Which office, which fee, who files |
| Water test | Lab fee | Which tests and which certified lab |
Why does depth set the cost range?
Depth is the biggest unknown. Contractors base estimates on what experience shows is an average depth for your area, and a contractor cannot tell you exactly how deep to go to reach water. If the water first reached is adequate, drilling can stop there. Water Systems Council: Determining the Depth of a Well [WSC-DEPTH source note]
That uncertainty is why the high scenario matters. The Montana guide recommends setting a maximum depth the driller cannot exceed without your express agreement, with any extra drilling agreed in writing. Montana DNRC well-owner guide (revised 2007) Enter that same maximum here to see what it could cost. [MT-DNRC source note]
How do you compare two quotes with the calculator?
Run the calculator once for each written quote, then compare the results line by line rather than total to total:
- Same depth, different rates. If both drillers expect the same depth, the per-foot rates and casing assumptions explain most of the gap.
- Different depths. If one driller expects a much deeper well, ask why. Check the depths in nearby well reports; see how deep a residential well should be.
- Missing lines. A quote that leaves out the pump, tank or water line will look cheaper. Add those lines from the other quote, or ask the bidder to price them, so you compare complete systems. Complete well installation cost lists every component.
- Different high scenarios. Compare the maximum depth each driller will agree to in writing and the per-foot rate past the estimate.
Print each estimate and keep it with the quote checklist. The calculator clears when you leave the page; nothing is stored.
What can't a well drilling cost estimate tell you?
The output is arithmetic on your inputs. It does not know your geology, whether the hole will produce enough water, what your water test will show, or what your local permit office charges. It also cannot settle who pays if the well comes up dry; that is a contract question to resolve before drilling starts.
Before you sign, compare offers line by line with the quote checklist, and read the complete well installation cost breakdown to make sure no part of a working system has been left out.
Common questions
Why doesn't this calculator show average well drilling prices?
Rates vary by region, geology, depth band, rig type and season, and national averages hide those differences. The only numbers that describe your project are written quotes from contractors who have looked at your site, so the calculator asks you to enter them.
What should I use for expected depth?
Use the depth the contractor wrote on the quote, which is usually based on nearby wells and local experience. Ask what they assumed and check nearby well reports where your state publishes them. Then enter a maximum depth you would approve as the high scenario.
Is casing included in the per-foot drilling price?
Sometimes, but often not. Industry contract guidelines recommend itemizing drilling per foot and casing per foot separately, along with casing diameter and wall thickness. If your quote combines them, enter the combined rate as drilling and leave casing blank.
How much contingency should I add?
There is no standard percentage. Base it on what is uncertain in your quotes: unknown depth, possible extra casing in loose ground, treatment that a water test may require, or access work. The high scenario shows how much each assumption moves the total.
Does the calculator save or send my numbers?
No. The arithmetic runs in your browser. Nothing you type is stored, submitted or sent anywhere, and the clear button empties every field.
Is this a water well drilling cost calculator or a pump calculator?
It covers the whole water well project: drilling, casing, sealing, development and testing, plus the pump, pressure tank, water line, electrical work, permits and water testing. Leave out any line your project doesn't include.
Sources & claim context
Citations mark where guidance is grounded. They are general resources dated on retrieval, not guarantees for any property, project, price, licensure, permit or yield. No expert, attorney or reviewer signoff is claimed by this site.
Montana DNRC well-owner guide (revised 2007) · MT-DNRC · accessed 2026-10-10
https://dnrc.mt.gov/_docs/water/waterwelldrillowner.pdf
Historical Montana document; do not nationalize its licensing, bond, permit, yield, pricing or legal clauses; refresh with current local authority
Water Systems Council: Determining the Depth of a Well · Water Systems Council (wellcare) · accessed 2026-10-10
Undated industry sheet; typical-range figures are not a prediction for any property
NGWA (Wellowner.org): Guidelines for Written Contracts · NGWA · accessed 2026-10-10
https://wellowner.org/basics/planning-for-a-water-well/guidelines-for-written-contracts/
Does not prescribe who pays for a dry hole
Claims are grounded in the dated source notes above; project-specific price, yield, licensure and permit answers require site-specific and local verification.