Two-offer comparison worksheet

Your private working copy. Type your own notes from the two written proposals. Nothing here is submitted, saved, or sent anywhere — close the tab and it is gone. This worksheet does not claim a provider directory or service.

Offer A
Who submitted this proposal; the written quote ID or version.
What the written proposal actually describes.
Line items stated as included or explicitly excluded, with references.
Enter the written price or pricing basis as text. This worksheet does not calculate or estimate anything.
What is payable and who approves if no usable water; stop-work and change terms.
What still needs a written answer before you sign.
Offer B
Who submitted this proposal; the written quote ID or version.
What the written proposal actually describes.
Line items stated as included or explicitly excluded, with references.
Enter the written price or pricing basis as text. This worksheet does not calculate or estimate anything.
What is payable and who approves if no usable water; stop-work and change terms.
What still needs a written answer before you sign.

This worksheet is not legal advice, an estimate, a contract, or a promise of water. Before signing, check the final agreement and local requirements with appropriately qualified professionals.

Use this well drilling quote checklist to compare two written offers line by line. "Per-foot" names a charging unit; "turnkey" describes a proposed scope, not a standard list of included tasks. Neither label tells you who pays if drilling does not produce usable water. Compare the written terms for the same property, asking each bidder to identify inclusions, exclusions, assumptions and approval points. A Montana well-owner guide recommends written estimates and an agreed maximum depth; it is older, Montana-specific guidance, not a nationwide contract rule. Montana DNRC well-owner guide (revised 2007) [MT-DNRC source note]

Use this page as a blank worksheet. Print it from your browser's Print command or save it as a PDF using your browser's print dialog. Nothing on this page needs to be submitted to compare your offers, and your entries are handled only in your browser. Do not record sensitive personal information on a shared or public device.

What details should you record from each quote?

Property or project identifier (your own shorthand): ____________________

Proposal detail Offer A Offer B — comparison worksheet
Proposal detailOffer AOffer B
Contractor name and contact________________________________________
Written proposal date and version________________________________________
Property / proposed well location________________________________________
Intended use described to bidder________________________________________
Scope document or attachment reference________________________________________
Pricing basis as written________________________________________
Stated exclusions or assumptions________________________________________

Attach or retain both original proposals. A verbal explanation should be reflected in a revised written offer if it changes the work or price.

What does each well drilling quote actually include?

For each offer, enter I (included), E (excluded), or U (unclear), followed by its written line or page reference. Leave unknowns as U until clarified; never treat a missing line as included. The rows are questions, not a standard turnkey package.

Item to confirm Offer A: I/E/U + written reference Offer B: I/E/U + written reference — comparison worksheet
Item to confirmOffer A: I/E/U + written referenceOffer B: I/E/U + written reference
Charging unit; what that unit buys________________________________________
Estimated depth and assumed conditions________________________________________
Site visit, mobilization and equipment access________________________________________
Drilling and any minimum or separate charges________________________________________
Casing, screen if applicable, and sealing________________________________________
Development and well completion________________________________________
Pump, controls and pressure tank if needed________________________________________
Trenching, electrical and water connection________________________________________
Water sampling, tests and delivery of results________________________________________
Permit or inspection coordination________________________________________
Well records and other deliverables________________________________________
Cleanup and restoration________________________________________

Which line items remain unclear? Offer A: ____________________ Offer B: ____________________

Which tasks would need another contractor or separate proposal? Offer A: ____________________ Offer B: ____________________

How do you control extra depth and changes?

Ask both bidders: What depth is assumed? Is there a written maximum or decision point? Who must approve going deeper, what price basis applies beyond the assumption, and can work pause while you review a change? What happens if access or geology changes the method? Write the exact proposal references below. The Montana guide's maximum-depth suggestion is a prompt to ask; the enforceability of any term depends on your actual agreement and jurisdiction. Montana DNRC well-owner guide (revised 2007) [MT-DNRC source note]

Change question Offer A: written answer / clause Offer B: written answer / clause — comparison worksheet
Change questionOffer A: written answer / clauseOffer B: written answer / clause
Assumed depth; agreed stop/maximum________________________________________
Who approves extra depth or changed method?________________________________________
Added work: price basis and written authorization________________________________________
Who can stop work and what is then payable?________________________________________

Do not infer that a quoted per-foot figure includes completion equipment or that a lump-sum figure cannot change. Have material contract terms reviewed by a qualified adviser in the applicable jurisdiction.

What happens if the well is dry?

Ask what the proposal means by an unsuccessful attempt: insufficient yield, unusable quality, or another specified condition. What drilling and mobilization work is payable even if the well does not meet your intended use? Who decides whether to stop, deepen, test again, relocate or attempt another hole, and who must authorize and pay for that work? Is any remedy actually written, with conditions and limits? There is no universal dry-hole payer or water guarantee implied by this worksheet.

Unsuccessful-attempt question Offer A: written reference Offer B: written reference — comparison worksheet
Unsuccessful-attempt questionOffer A: written referenceOffer B: written reference
Definition and decision point________________________________________
Work payable if no usable water________________________________________
Approval and price of another attempt________________________________________
Any written remedy and its limits________________________________________

What deliverables should a quote list?

Ask who supplies the completion record or well log, any tests and results, equipment documentation and site cleanup. Ask for the proposed schedule and how delays or changes are communicated. Then ask the authority responsible for wells at your property which permits, construction requirements, records or inspections apply; do not adopt a Montana-specific rule elsewhere. Montana DNRC well-owner guide (revised 2007) [MT-DNRC source note]

Water quality requires a separate question. The EPA provides private-well owner guidance; federal Safe Drinking Water Act standards for public water systems do not regulate private domestic well drinking-water quality in the same way. That does not settle local testing requirements or prove that water is safe. Ask who samples, what is tested, who receives the results and what happens if a result raises concern. EPA: Private Wells [EPA source note]

Final handoff Offer A: written reference Offer B: written reference — comparison worksheet
Final handoffOffer A: written referenceOffer B: written reference
Well log / completion record________________________________________
Testing responsibility and results________________________________________
Local approvals and inspection responsibility________________________________________
Equipment documents and cleanup________________________________________
Schedule and delay communication________________________________________

Per-foot vs. turnkey: which is better?

Neither is better in every case. A per-foot quote is transparent about the drilling rate but leaves the final price open until the depth is known, so it needs a written maximum depth and clear dry-hole terms. A turnkey quote prices a defined scope, sometimes a finished, producing well, so it can be easier to budget, but it often builds the contractor's risk into the price and its exclusions matter. NGWA's contract guidance recommends itemizing charges either way, including drilling and casing per foot, grouting, development, test pumping, disinfection, drilling deeper or a second well, abandonment and sealing if necessary, and anything not included. NGWA: Guidelines for Written Contracts [NGWA-CONTRACT source note]

To compare a per-foot quote with a turnkey one, price the per-foot offer at its expected depth and at its maximum depth in the well drilling cost calculator, add any lines it excludes, and set both totals beside the turnkey price. The dry-hole clause often decides which is cheaper in a bad outcome; see who pays for a dry hole. For the full list of components a working system needs, see complete well installation cost.

Use your browser's Print command to take this page to a meeting, or save a local PDF. Fill the blanks from actual written offers. Circle every U, request clarification in writing, and retain revised copies. If you first need a breakdown of cost drivers, read What affects the cost of drilling a water well?. To identify potential bidders, consult the applicable local authority or an independent source such as NGWA's contractor lookup; this page does not claim a provider directory, and no directory listings exist yet. [NGWA source note]

This worksheet is not legal advice, an estimate, a contract, or a promise of water. Before signing, check the final agreement and local requirements with appropriately qualified professionals.

Common questions

What should a well drilling quote include?

At minimum: the pricing basis, expected and maximum depth, casing and grouting, development and yield testing, what's owed if the well is dry, who handles permits and the well report, cleanup, and a list of exclusions. Pump and connection work may be separate.

What does turnkey mean in a well drilling quote?

It means the contractor prices a defined scope, sometimes up to a working, connected well. There's no standard definition, so read exactly what is included and excluded.

Can I negotiate a well drilling quote?

You can ask for changes to scope, depth limits, dry-hole terms and payment schedule. Get any agreed change in a revised written offer.

Does this worksheet save my entries?

No. Your entries stay in your browser and are not submitted or stored. Print or save a PDF to keep a copy.

Find the drillers

Bring a shortlist to your checklist.

When provider listings exist, pair each written offer against this comparison worksheet.

Open the well driller directory

Sources & claim context

Citations mark where guidance is grounded. They are general resources dated on retrieval, not guarantees for any property, project, price, licensure, permit or yield. No expert, attorney or reviewer signoff is claimed by this site.

  1. Montana DNRC well-owner guide (revised 2007) · MT-DNRC · accessed 2026-10-10

    https://dnrc.mt.gov/_docs/water/waterwelldrillowner.pdf

    Historical Montana document; do not nationalize its licensing, bond, permit, yield, pricing or legal clauses; refresh with current local authority

  2. EPA: Private Wells · EPA · accessed 2026-10-10

    https://www.epa.gov/privatewells

    Does not specify local testing/permit rules or guarantee safety

  3. NGWA: Find a Contractor · NGWA · accessed 2026-10-10

    https://wellowner.org/find-a-contractor/

    Not this site’s supply or endorsement; membership not license verification

  4. NGWA (Wellowner.org): Guidelines for Written Contracts · NGWA · accessed 2026-10-10

    https://wellowner.org/basics/planning-for-a-water-well/guidelines-for-written-contracts/

    Does not prescribe who pays for a dry hole

Claims are grounded in the dated source notes above; project-specific price, yield, licensure and permit answers require site-specific and local verification.